
Content
1 Introduction �������������������������������������������������� 3
1.1 General ...........................................................3
1.2
Intended use ....................................................3
1.3 Security ...........................................................3
1.4
With applicable documents ...............................3
1.5
Installation instructions ......................................3
2 Description ���������������������������������������������������� 4
2.1
Special benefits ................................................4
2.2
Insulation system ..............................................4
3
Planning aids ������������������������������������������������� 5
3.1 Transport .........................................................5
3.2
Notes on buffer water .......................................5
3.3
Connection to boiler and heating circuit ..............5
3.4
Modular design of buffer store ...........................5
3.5 Venting ............................................................6
3.6
Temperature sensor ...........................................6
3.7
Electric auxiliary heating ...................................6
3.8 Materials .........................................................6
3.9
Installation location ...........................................6
3.10 Standards ........................................................6
3.11 Notice of withdrawal ........................................6
4
Technical data ������������������������������������������������ 7
4.1
Individual containers and thermal insulation ........7
4.2
Dimensions, weight and pressure loss .................8
4.3
Minimum room sizes for module installation ........9
5
Hydraulic plans �������������������������������������������� 10
5.1 General
........................................................10
5.2
Integration of heat generator ...........................12
5.3
Hot water ......................................................12
5.4
Solar system...................................................13
5.5
Biomass boiler................................................14
5.6
Automatic boilers ...........................................15
5.7
Heat pump remote DHW preparation ...............16
5.8 CHP ..............................................................17
5.9
Biomass boilers and combined thermal store .....18
5.10 Large solar system ..........................................19
6
Assembly instructions ���������������������������������� 20
6.1
Check on delivery ...........................................20
6.2 Tools .............................................................20
6.3
Floor preparation ..........................................20
6.4 Transport
......................................................21
6.5
Container Assembly .......................................22
6.6
Control module Assembly ................................26
6.7
Pressure test ...................................................26
6.8
Connection to the heating system,
Equipotential bonding ..........................................28
6.9
Insulation installation ......................................28
6.10 Maintenance: Vent access ................................35
6.11 Disassembly ...................................................35
2
T D M A - VA R I C A L :
Content