
17
5�8 CHP
CHP basic supply with peak-load boilers, 2 mixed heating circuits, Central fresh water station
According to the manufacturer’s specifications and type of pipe network or heating water, it may be necessary to indirectly
connect the CHP. -> see the following drawing
HT
LT
HF
HF
CI
ST
SBT
SBB
SB
T D M A - VA R I C A L :
Hydraulic plans