
Installation Manual
Spring Cable Reel
BEF150 – BEF500
MAL6100-0001a-EN
www.conductix.com
translated document
Page 22 of 54
During installation, please note:
→
The axis of the spring cable reel must always be positioned horizontally.
→
The screw attachment surface must be flat.
Fig. 7 Fastening flange and reel axis
CAUTION!
Reel attachment
The threaded pin for attaching the flange (detail A, Fig. 7) must engage in the depression in
the axis. The threaded pin is secured at the factory against loosening.
→
Do not loosen the threaded pin, secure it again when it is screwed back in
→
Be sure the reel is mounted at right angles to the cable take-off!
Use the following screw sizes to match the drilling template:
Dimension/drilling template
Screw size
Tightening torque, match to screwing surface
BEF150/61-F001-0039
M8 (4x)
25 Nm
BEF185-135/61-F001-0055
M12 (4x)
85 Nm
BEF400-500/61-F001-0056
M16 (4x)
210 Nm
Leave the following dimensions for the cable entry depending on the conductor cross-section/dimensions:
Size
Connection hole
Max. cable diameter
BEF150
M20x1.5
10 mm
BEF185-225
M25x1.5
20 mm
BEF265-325
M32x1.5
25 mm
BEF400-500
M40x1.5
35 mm
Axis horizontal
Screw attachment
surface flat