MCDD-100 MetaCarrier Detection Device
Revision 3
Installation
MN-MCDD100
2–3
Feature
Description
1
Custom Rack Enclosure
2
MCDD-100 MetaCarrier®
Detection Device
3
Standard Rack Shelving
4
Rack Enclosure Threaded Front
Mounting Rail (typical)
5
Unit Front Panel
6
User-supplied Screws
Figure 2-2. Installing into a Rack Enclosure
Mount the MCDD-100 in its assigned position in the rack enclosure. Use, as required:
•
A standard rack-mounted shelf;
•
User-supplied screws to secure the front panel to the rack enclosure threaded front
mounting rails;
•
Comtech EF Data’s optional
KT-0000168 (4”) or KT-0000195 (10”) Rear-Mounting
Support Brackets Kit (
Figure 2-3).
Содержание MetaCarrier MCDD-100
Страница 8: ...MCDD 100 MetaCarrier Detection Device Revision 3 Table of Contents MN MCDD100 viii BLANK PAGE ...
Страница 30: ...MCDD 100 MetaCarrier Detection Device Revision 3 Installation MN MCDD100 2 6 Notes ...
Страница 40: ...MCDD 100 MetaCarrier Detection Device Revision 3 Rear Panel Connectors and Pinouts MN MCDD100 3 10 Notes ...
Страница 60: ...MCDD 100 MetaCarrier Detection Device Revision 3 Serial based Remote Product Management MN MCDD100 5 10 Notes ...
Страница 86: ...MCDD 100 MetaCarrier Detection Device Revision 3 Appendix A MN MCDD100 A 8 Notes ...
Страница 87: ......
Страница 88: ...2114 WEST 7TH STREET TEMPE ARIZONA 85281 USA 480 333 2200 PHONE 480 333 2161 FAX ...