Chapter 5
Configuring the OneCell system
5-2
913035 4.0.04 June 2019
D
R
A
F
T
Overview
Once the Baseband Controller and Radio Point are installed and connected, you will
need to configure the OneCell system. Logging onto the BC for the first time opens
the Web GUI in Installation Mode. This chapter contains the procedures for initial
configuration. For more information about the Installation mode, see
OneCell
®
Administration
(913026)
In preparation of configuring the OneCell system:
•
Use the Controller GUI, called the Web GUI, to configure all components, except
the Ethernet switches
•
Confirm with the operator that the Baseband Controller is provisioned and
configured on the DMS
Configuring the Baseband Controller using the Web GUI completes the Baseband
Configuration. Once the Baseband Controller and Ethernet switches configurations
are complete, go to
Chapter 6, Verifying the OneCell installation
to test the installation
and initial configuration.
Содержание OneCell RP5100i
Страница 7: ...Contents OneCell Installation and Commissioning RP5000 series Release 4 0 vii DRAFT ...
Страница 10: ...List of tables x 913035 4 0 04 June 2019 DRAFT ...
Страница 12: ...Document revision history xii 913035 4 0 04 June 2019 DRAFT ...
Страница 18: ...About this document xviii 913035 4 0 04 June 2019 DRAFT ...
Страница 20: ...DRAFT ...
Страница 28: ...DRAFT ...
Страница 42: ...Chapter 4 RP5100i installation 4 6 913035 4 0 04 June 2019 DRAFT 5 Replace the ceiling tile with the cutouts ...
Страница 68: ...Chapter 4 RP5100i installation 4 32 913035 4 0 04 June 2019 DRAFT Installation is complete ...
Страница 69: ...DRAFT Part III Commissioning Chapter 5 Configuring the OneCell system ...
Страница 70: ...DRAFT ...