Chapter 3
Baseband Controller installation
OneCell
®
Installation and Commissioning, RP5000 series, Release 4.0
3-5
D
R
A
F
T
7
In the back of the rack, carefully slide the PFU into the back of the chassis.
CAUTION
The PFU has a fan hazard. A label is affixed to the top of the PFU indicating the
hazard.
Fan hazard label
NOTE:
The connectors on the PFU should fit easily into the connector on the BC.
Do not force the PFU into the chassis.
Содержание OneCell RP5100i
Страница 7: ...Contents OneCell Installation and Commissioning RP5000 series Release 4 0 vii DRAFT ...
Страница 10: ...List of tables x 913035 4 0 04 June 2019 DRAFT ...
Страница 12: ...Document revision history xii 913035 4 0 04 June 2019 DRAFT ...
Страница 18: ...About this document xviii 913035 4 0 04 June 2019 DRAFT ...
Страница 20: ...DRAFT ...
Страница 28: ...DRAFT ...
Страница 42: ...Chapter 4 RP5100i installation 4 6 913035 4 0 04 June 2019 DRAFT 5 Replace the ceiling tile with the cutouts ...
Страница 68: ...Chapter 4 RP5100i installation 4 32 913035 4 0 04 June 2019 DRAFT Installation is complete ...
Страница 69: ...DRAFT Part III Commissioning Chapter 5 Configuring the OneCell system ...
Страница 70: ...DRAFT ...