58
8.4.5 Route express fibers and “dead to field” onto Feed Thru tray. See photo 216.
8.4.6 Route fibers to be spliced to top splicing tray. See photos 217-219.
8.4.7 Splice per standard practice. Replace dust cover on tray after splicing.
Mini-OTE 300 Installation Guide
All trademarks used in this publication are CommScope registered
201
9
CommScope Inc. All rights Reserved
Feed
Thru Tray
Routing Tray
Photo #216
Middle Splice Tray
Fiber to be
spliced routing
up to top splice
tray
Photo #218
Feed
Thru Tray
Routing Tray
Fiber to be spliced
Photo #217
Top Splice
Tray
Photo #219
Fiber to be
spliced routing
up to top splice
tray
Feed
Thru Tray
Routing Tray
Photo #216
Caution:
SMOUVS
must
be
centered when placed in the holders.