Mini
-
OTE 300 Installation Guide
All
trademarks used in this publication are CommScope registered
201
9
CommScope Inc. All rights Reserved
49
7.4 FIBER ORGANIZING/STORAGE, ROUTING AND SPLICING
7.4.1 INLINE EXPRESS (thru) configuration Ribbon Central Core Tube Shielded/Unshielded
7.4.2 Route ribbon to tray entry points and mark ribbon 1” beyond grommet locations.
De-ribbonize fiber between
marks. See photos 173-174.
7.4.3 Install ribbon grommets onto ribbon one inch before de-ribbonize point. Install grommets into routing tray and
secure with cable tie. See photos 175-177A.
7.4.4 Repeat steps 7.4.2 – 7.4.3 with fiber coming from other end of cable.
7.4.5 Cut fibers to be spliced 41” from the signal input side.
7.4.6 Route express fibers onto feed thru tray. See photo 178.
Routing tray
entry points
Photo #173
Slots for
grommets
Mark ribbon 1”
beyond grommet
Photo #174
Photo #175
Ribbon grommet
Photo #176
1”
Fiber de-ribbonized
Feed Thru
Tray
Routing Tray
Photo #178
Photo # 177
Photo # 177A
Caution:
Secure with
cable tie so that it is
oriented as shown in
photo # 177A