7.1.10 Mark ribbon fibers 46” from the cable jacket opening on incoming signal side of cable.
7.1.11 Remove ribbon containing fiber to be spliced from fiber stack.
Store express fibers in storage area starting
with fiber entering closure from the right side. See photo 161. Tray stack may be removed for easier access to
storage. See photos 159-161.
7.1.12 Proceed to
Section 7.4
for Fiber Routing and Splicing.
7.2 CABLE & EXTERNAL GROUNDING
7.2.1 For cable with shielding, remove a
section of the outer sheath 180
⁰
around the cable by
1.0”
in length
measured from the end of the outer sheath in order to expose cable shielding. See photo 162.
7.2.2 For grounding, press ground bar into slot in closure.
If using Inline configuration, install inline ground bar and
secure with bolt. See photo 163.
1”
Photo #162
180
⁰
Inline ground bar placed on top of
standard ground bar & secured with bolt
Inline ground bar placed under cable
retention assembly & secured with bolt
Insert ground bar
into slot in
Photo # 163
Squeeze
tab. Lift
up to
remove
Squeeze
tab. Lift up
to remove
tray.
Photo #159
Route cable entering from
right first. Cable entering
from left crosses over.
Photo #161
Storage
Photo #160
NOTE:
Exposed
shielding will be
bonded to the cable
retention bracket and
ground bar.