Visit www.commscope.com for complete specifications on all the products listed
Bulletin # 7693902 Rev. L
Technical Publication
22
Section 13: Jacketing Removal Procedure for Additional Grounding
1. Score the jacketing 360º
2. Measure 51 mm (2 in) and repeat
3. Identify where the aluminum shielding overlaps, this will feel like a flat spot in the cable
4. Remove a section of jacketing between score marks
5. Lift edge of jacketing
6. Grab lifted edge of jacketing with a pair of pliers and roll on the cable
7. Remove excess adhesive with a piece of emery cloth
* Grounding kit installation instructions included with the grounding kit.
Scan to
view video
Reel Packaging
Carefully remove shrink wrap
After shipment arrives take extra care when removing the over packing. Remove reel from box or cut strap holding the
reel to the shipping pallet. Take care not to damage the assembly as you roll the reel to installation location. Excessive
nicks and cuts in the outer jacketing can cause failure. Place reel on stands to lift off the ground so the reel can spin
freely while still being controlled by hand.
Lift the shrink wrap away from the cable before removing with scissors. Cable is transported on a double flange reel so
both ends may be accessed for pre-testing if required.
Place reel on jack stands