14
INSTALLATION:
The machine must be installed by a specialized technician authorized by and in compliance with the instructions given
in this manual.
TRANSPORT AND HANDLING:
To load or unload the machine and/or components from/onto the means of transport, use a lift truck or fork lift
equipped with forks that are at least half the length of the machine housing; use a crane if the machine is fitted with
eye bolts. Select the lifting equipment suited to the weight and overall dimensions of the packaged
machine/components. During the transportation, close the door and fix the wheels and all components.
1-
UNPACKING:
Remove all cardboard, wood or other materials from the wood base on which the machine is set. Lift the machine/
components with suitable means (e.g. lift truck), remove the wood base then position the machine / components in
the allocated site.
• Once all packing material has been removed, check that the machine has not been damaged in any way.
• remove the protective PVC film on the stainless steel panels from all internal and external surfaces.