Tempest NG User Manual v1.2013
17
Components
Headsets
The headsets actually worn by each user are dynamic microphone headsets. Previous
models sold are the PH-100 and PH-200 and the HR-1 and HR-2. CoachComm now offers
exclusively the S-Series headsets that feature our SmartBoom™ technology. SmartBoom
enables a user to effortlessly mute their microphone by simply raising the boom above
their brow. Re-enable the microphone by lowering back to the mouth. All headsets have
a 4-pin XLR connector and are compatible with the Telex® AudioCom® system, as well as
with Tempest products, and the choice of which unit to use is strictly up to the user.
Field and Pressbox Cables
Wired users are connected to the Sideline Unit and the Pressbox
Unit via Field and Pressbox cables. Field cables are generally 100’
in length. They can be customized to 125’ or 150’. Pressbox cables
are generally 25’ in length. There are two variations of each cable:
single line and dual line. The single line cables (ME 100HD and ME
25HD) are used in conjunction with the BP 1002 single line BeltPack
for those users who are to have direct access to only one line (See
exception in Isolate/combine section). The dual line cables (ME
100/2HD and ME 25/2HD) are used in conjunction with the BP 2002
dual line BeltPack for those users who are to have direct access to
two lines.
Power Supply
Both the Pressbox Unit and the Sideline Unit have integrated power supplies. These power supplies provide power for each
intercom line. Two PS 4001s are used in 4 line systems (one each in pressbox and on sidelines) and four PS 4001s are used in an
8 line system (two each in pressbox and on sidelines).
On the inside of the Sidelines Unit and the Pressbox Unit the power supplies are attached to the WIM 8(RD). The NG Series
system operates optimally with both units plugged into AC current. If you do not have AC power available at both ends of your
system, it is possible to operate the wired portion of the system with AC power connected to only one end of the system. In this
mode, however it is important to connect at least four (4) ground wires (two pair) between the sidelines and pressbox units.
Содержание Tempest NG Sideline
Страница 1: ...v1 2013 Sideline Communications System User Manual ...
Страница 5: ... This page intentionally left blank ...
Страница 9: ...4 This page intentionally left blank ...
Страница 10: ...Tempest NG User Manual v1 2013 5 Block Diagrams Block Diagrams TNG System Block Diagram ...
Страница 11: ...6 Block Diagrams Sideline Unit Block Diagram ...
Страница 12: ...Tempest NG User Manual v1 2013 7 Block Diagrams Pressbox Unit Block Diagram ...
Страница 13: ...8 This page intentionally left blank ...
Страница 23: ...18 This page intentionally left blank ...
Страница 27: ...22 Components This page intentionally left blank ...
Страница 58: ...Tempest NG User Manual v1 2013 53 Game Day Setup This page intentionally left blank ...
Страница 64: ...Tempest NG User Manual v1 2013 59 Notes ...