Assembly Instructions for Seig X2 and X2D Benchtop Mini MIll

Содержание Seig X2

Страница 1: ...Assembly Instructions for Seig X2 and X2D Benchtop Mini MIll...

Страница 2: ...The kit includes 3 16mm ball screw and ball nut assemblies 3 NEMA 23 stepper motor mounts All necessary mounting hardware All new thrust bearings assemblies All new shaft connectors to connect the bal...

Страница 3: ...ll do but lithium is recommended An electric drill To prepare the machine if new please remove all the rust prohibitive applied by the factory If used please remove all shavings and dirt from the mach...

Страница 4: ...u must be very careful when removing the ball nut from the ball screw using the carboard tube supplied You will have to unscrew the nut from the ball screw onto the cardboard tube to assure that you d...

Страница 5: ...the left side table endplate from the table Now loosen the jam nuts that hold the gib in place Once these are loosed use an Allen wrench to back out the gib adjustment screws The table is now loose a...

Страница 6: ...ad screw nut in the Y axis cross slide Be sure and mark these two bolts as you will need them later for re assembly You should be able to lift the lead screw and nut up from the base Set it to the sid...

Страница 7: ...e two bolts that hold the bearing housing from the front of the base Then remove the bolt that holds the Y axis lead screw nut from the cross slide casting You should now be able to unscrew the lead s...

Страница 8: ...djustment screws and back out the gib adjustment screws as before The are located on the right side of the Y axis cross slide casting You should now be able to slide the Y axis cross slide casting fro...

Страница 9: ...ll machinist jacks You will be moving the head up and down using the handles on the fight side of the head However when you remove the rack gear the head is free to fall down and must be secured in pl...

Страница 10: ...ly raise the spindle motor and mount from the head Be extra careful not to drop it or you may pull the wires from the electronics box or the motor itself You will need something to set the motor on wh...

Страница 11: ...e you will need to secure the head in place The next step will remove the ability to raise or lower the head using the Z axis cranking levers Wooden blocks or jacks between the spindle and the table O...

Страница 12: ...ped in place the remaining screws removed from the rack gear rotate the head raising lowering levers to raise the rack gear from the top of the column and remove it It is no longer needed Pull rack up...

Страница 13: ...he small Phillips screws Remove the set screw that holds the crank levers in place and pull it off it is no longer needed Then remove the thin metal cover The remove the housing that holds the pinion...

Страница 14: ...ay no longer raise or lower the head with the cranking levers Start by removing the set screw that locks the handle assembly to the pinion gear that goes through the head Set it to the side it is no l...

Страница 15: ...hile attaching the screws that connect it to the column Align the holes in the clamp bar and use the screws provided attach it to the column by putting the screws into the holes on the column that the...

Страница 16: ...xis cross slide to the base first Note If your machine has a lifting device mounted to the left side of the headstock it must be removed There is no instruction for this as there are only two screws n...

Страница 17: ...ess to the bottom of the base and raised so that you can insert the Y axis ball screw assembly through the bottom of the base into the hole at the front of the casting You will then need to set the ba...

Страница 18: ......

Страница 19: ...ere Do not tighten at this point screw in just enough to engage the gib Note the gib has indentions that the end of these screws go into Make sure they are just inside the indentions so that when you...

Страница 20: ...is is shown with a left sided mount If you decide to mount it on the right side you will need to remove the ball nut from the screw and reverse To do so you must be very careful when removing the nut...

Страница 21: ...e re insert them through the ball nut mount and into the Y axis cross slide base Note the orientation of the nut the recirculation tubes are on the bottom side of the nut This must be oriented this wa...

Страница 22: ...nt is on the correct side facing out It can be identified by have a measuring scale on it Note it can be installed from either side Go slowly as the ball nut mount and table bottom are very close In f...

Страница 23: ...Some grinding may be required...

Страница 24: ...n the table end plate is off set to match the dovetails but the holes that mount it to the table are in the center of the table Therefore the end plates can be installed incorrectly Please make sure t...

Страница 25: ...ok nut and stepper motor mount on the threaded end of the ball screw Do not tighten the bolts at this point Install the ball nut receiver making sure the roller support bearing is in the receiver Do n...

Страница 26: ...e much easier since it is shipped assembled and all you have to do is remove the lift rod and slip the assembly down on to the top of the column You may have to rotate the ball nut to raise or lower t...

Страница 27: ...The column clamp bar is already inside the column...

Страница 28: ...of the column move it around until the 3 8 16 threaded hold is in the slot on the top of the column top plate Thread the 3 8 16 bolt that is provided into the column clamp bar with the washer provide...

Страница 29: ...the ball nut and lower the ball screw down until the holes in the end of the side plates align with the holes in the side of the head that were left when you removed the rack and pinion from the head...

Страница 30: ...t fit into at dis assembly Now move the side plates Down until the holes align insert the shoulder bolt provided through the side plate and into the lift pin You can now move to the other side and ins...

Страница 31: ...o install the shaft couplings on the end of the X and Y ball screw shafts Put a shaft into the other end of the coupling and use a drill to move the X and Y axis Select an axis to adjust and place the...

Страница 32: ...move the axis all the way to one end and just snug the bolts on the table end plate Then move it in the other direction until it is at the other end of the table Snug the bolts on that table end plat...

Страница 33: ...gibs This is extremely important If the gibs are too tight the machine will not move properly And if the stepper motors are installed at this point they may bind and stall On the X and Y ball nut moun...

Страница 34: ...t 3 Now move the Y axis away from the operator and towards the column Tighten the Y axis ball nut mount bolt located at the front of the Y axis cross slide casting in the center near the bottom 4 Agai...

Страница 35: ...alled 2 The steps are the same move the axis to the top of the column and snug the 3 8 26 bolt that is holding the column top plate to the column Before tightening Align the column top plate to the co...