If you have problems, reprogram the controller, check the installation direction of the
LTV846 chip. At the output of the DC-DC converter, measure the + 5V.
Figure 3.5.5
Additionally check all relevant solder connections.
Testing the output (SpRel) for switching relays/milling spindles
:
Open Estlcam and got to „View->CNC Controller (F2)“
Figure 3.5.6