Operating Instructions
T-Rex-Series
CNC-STEP e.K. ▪ Siemensstrasse 13-15 ▪ 47608 Geldern ▪ Germany
Page 60
Support: +49 (0)2831/91021-50
31.03.2014
8 . 3
M a i n t e n a n c e S c h e d u l e
In the following sections, the maintenance is described that is necessary for optimum and trouble-
free operation of the machine.
If increased wear can be seen during regular inspections reduce the required maintenance intervals
according to the actual wear and tear. For questions about maintenance work and intervals, contact
the manufacturer.
Refer to the separate operating instructions, for the maintenance of the supplied
components.
Modell T-Rex
Interval
Maintenance work
To be carried out by
daily
Clean the machine
Operator
Check machine for damage and wear
technical personnel
10 hours
Oil ball screws
technical personnel
Oil the round shaft guides
technical personnel
Oil the profile rail guide
technical personnel
As required
Clean machine from the outside with a cloth
DIN 61650
Operator