
3
BEFORE INSTALLATION
Handling
Check that all handling equipment complies with local safety
regulations (cran, forklifts, ropes, hooks, etc.).
Provide personnel with personal protective equipment suitable
for the situation, such as helmet, gloves, accident-prevention
shoes, etc.
Observe all safety procedures in order to guarantee the safety
of the personnel present and the of material..
Lifting
Verify unit weight and handling equipment lifting capacity.
Identify critical points during handling (disconnected routes,
flights, steps, doors).
Suitably protect the unit to prevent damage.
Lifting with balance
Lifting with spacer bar
Align the barycenter to the lifting point
Gradually bring the lifting belts under tension, making sure they
are positioned correctly.
Before starting the handling, make sure that the unit is stable..
1
2
3
6
4
5
6
Содержание WSAN-YSi R32
Страница 1: ...M0ND00023 00 07 21 R32...
Страница 21: ...6 ELECTRICAL CONNECTIONS PUMP 23 N 24 22...
Страница 73: ......
Страница 74: ...Via Camp Lonc 25 Z I Villapaiera 32032 Feltre BL Italy Tel 39 0439 3131 Fax 39 0439 313300 info clivet it...