
Start-up sequence
Unit power supply ON
Yes / No
1 compressor carter resistances operating at least since 8 hours
2 off-load voltage measure
3 phase sequence check
4 pump manual start-up and flow check
5 refrigeration circuit shut-off valves opening (if applicable)
6 unit ON
7 load voltage measure
8
if remote On-Off:
set dip-switch S5-3 on ON
9
if units in modular configuration
set dip-switch S12-2 on ON
set unit address via ENC4
10 verify the lack of bubbles in the liquid light (if applicable)
11 check of all fan operating
12 measure of return and supply water temperature
13 super-heating and sub-cooling measure
14 check no anomalous vibrations are present
15 set-point personalization
16 scheduling customisation
17 complete and available unit documentation
7 - START-UP
Содержание WSAN-YSi R32
Страница 1: ...M0ND00023 00 07 21 R32...
Страница 21: ...6 ELECTRICAL CONNECTIONS PUMP 23 N 24 22...
Страница 73: ......
Страница 74: ...Via Camp Lonc 25 Z I Villapaiera 32032 Feltre BL Italy Tel 39 0439 3131 Fax 39 0439 313300 info clivet it...