
General
The indicated operations should be done by qualified technician
with specific training on the product.
The electrical, water connections and the other system works are
by the installer.
Upon request, the service centres performing the start-up.
Agree upon in advance the start-up data with the service centre.
For details, refer to the various chapters in the manual.
Before checking, please verify the following:
the unit should be installed properly and in conformity with
this manual
the electrical power supply line should be sectioned at the
beginning.
The line sectionalizing device is open, locked and equipped
with the suitable warning
make sure no tension is present
WARNING
After turning off the power, wait at least 10 minutes before
accessing to the electrical panel or any other electrical
component.
Before accessing check with a multimeter that there are no
residual stresses
Do not power the unit with empty water side exchangers.
Possible damage to anti-freeze electric heaters.
7 - START-UP
Содержание WSAN-YSi R32
Страница 1: ...M0ND00023 00 07 21 R32...
Страница 21: ...6 ELECTRICAL CONNECTIONS PUMP 23 N 24 22...
Страница 73: ......
Страница 74: ...Via Camp Lonc 25 Z I Villapaiera 32032 Feltre BL Italy Tel 39 0439 3131 Fax 39 0439 313300 info clivet it...