![Clenergy PV-ezRack SolarRoof Series Скачать руководство пользователя страница 46](http://html1.mh-extra.com/html/clenergy/pv-ezrack-solarroof-series/pv-ezrack-solarroof-series_planning-and-installation-manual_2622553046.webp)
Project: CL-10088-SM-REV-C
Client: Clenergy Australia
PV-ezRack
Engineering Certificate
Note 18
General conditions
Note 18.1
Note 18.2
Note 18.3
Note 19
Spacings on Tile Interfaces will be reduced as follows:
Note 20
Note 21
Note 22
Note 23
Note 24
A minimum of two (2) screws per Tile Interface will be required for installation.
If
any
of
the
screws
of
the
interfaces
go
into
pre
‐
existing
holes,
they
will
have
to
be
one
size
up
compared
to
the
screws
that
were
previously
installed.
This
is
to
ensure
that
the
pullout
capacity
remains
the
same
or
higher.
ER-I-01/CS, ER-I-51 & ER-
I-01/EZC/ECO
-
When using Roof Extender (ER-RE-200), reduce interface spacings by 15% on Wind Region A
and B and 30% on Wind Region C and D.
ER-I-23
ER-I-26
Use the same spacing listed on the tables of this certificate for panels installed in landscape.
Minimum grade for steel purlins/battens of 450 Mpa.
Timber Grade members: F7 (Pine) and F17 (Hardwood).
% of Reduction
-28%
-28%
-50%
-50%
ER-I-02
ER-I-04
For installations on the Central Zone increase ER-I-01 & ER-I-05 Interface Spacings by 10%.
Interface
Increase of 20%
Reduction of 25%
30 mm
Spacings remain the same
Reduction of 35%
25 mm
Timber F17
Timber F7
Batten type
Batten-Purlin Depth / Screw embedment
If reducing screw embedment by using EZ-AD-C43 adaptor or if attaching to a smaller timber
batten/purlin, fixing spacing to be reduced/increased to timber purlins as per below:
Final Copy
11/12/2019
19