5.1.5 Caution! Do not use fitted roof hooks
as a ladder, as this extreme point load could
damage the tile below.
5.1.6 Variation for installation on plain tile
roofs with plain tile roof cladding: A recess
must be cut into the tiles around the position
of the roof hook.The tile flashing should be
used if necessary to prevent ingress of water.
5.2 Rail Installation
5.2.1 To connect several rails together, slide
half of the splice into the rear side of the
rail. Fasten the first M8 Bolt using an Allen
key, and slide the next rail into the splice.
Tighten the second M8 Bolt using an Allen
key. The total rail length is recommended
not to be over 30 meters considering rails
thermal expansion problem. Splice provides
the electrical connection between the 2 rails
through the pressure bolts. This eliminates
the need of using 2 earthing lugs
Recommended torque is 10 ~12 Nm.
5.2.2 If the rails consist of different lengths,
always begin with the shortest piece. Install
the PV modules on the Roof Hooks and
fasten loosely with M8 x 25 bolt and washers
as shown in the figure on the right. Two to
three screw turns are adequate for loose
installation.