Project: CL-10088-SM-REV-C
Client: Clenergy Australia
PV-ezRack
Engineering Certificate
Note 1
Spacing tables based on a minimum depth into timber of 35mm.
Note 2
Note 3
- 28 %
- 40 %
- 40 %
- 40 %
Note 4
Note 5
Note 6
Description
General Notes
Standard screws shipped for Tin and Tile Roof Interfaces
Metal Purlins/Battens
Fasteners to use
0.75 mm
Tile Interface:
10 TPI or 13g (6mm) - 10 TPI Roof Zip
This Engineering Document was designed to cater for most common installation scenarios
however, it does not cater for all of them. Contact Clenergy if you are unable to comply with
any of the installation specifications listed on this document.
Wind
Region A
1.5 mm - 2.4 mm
Wood Purlins and Rafters
Components
Part No.
Buildex- 14 - 11 x 70 Hex Head Zips Climaseal 3 with 16 mm
ABW on G550 Steel Battens
The following components are satisfied for use according to AS/NZS 1664.1:1997-Amdt
1:1999 and AS/NZS 1170.2:2011 Amdt 4-2016
Timber F7 (Pine) and Timber 17
(Hardwood). 35 mm embedment
Wind
Region B
Wind
Region C
Wind
Region D
Buildex- 14 - 11 x 70 Hex Head Zips Climaseal 3 with 16 mm ABW
Fasteners to be used
Tin and tile spacings were calculated based on Steel Purlins G450 1.5mm and Timber F7
(Pine). For 0.75 mm Steel Battens and 1.2mm purlins, all spacings shall be reduced as follows:
Tin Interface:
Buildex- 14 - 11 x 70 Hex Head Zips Climaseal 3
with 16 mm ABW or 14g (6.3 mm)
Tin Spacings were calculated based on Steel Purlins G450 1.5 mm. Contact Clenergy to find
the increase factor suitable for 1.9mm and 2.4mm purlin thickness.
ECO-Rail
ER-R-ECO/XXXX
ECO Rail
R-ECO/XXXX/AUMF
PV-ezRack Australian Made Mill Finish
ECO Rail
ER-SP-ECO
PV-ezRack Splice for ECO rail
Splice
Australian Made Mill
Finish ECO Rail
Final Copy
11/12/2019
15