Apex Tool Group
P2291BA | 2020-05
17
7
EN
7
Prior to initial operation
The tool was preset by Apex Tool Group. A setting for your
specific fastening sequence must only be made with the
controller or a PC by a qualified person. For more informa-
tion, refer to the programming manual.
7.1
Use of reaction bar
Fig. 7-1: Fixing the reaction bar
7.2 Setting up tool holder
1. Mount the tool holder on a stable base.
2. Place the tool in the tool holder with IrDA interface
portData transmission is possible in the Active,
Energy-saver mode and
Standby
operating modes, but
not possible in
Sleep
mode (see 8.2 Operating status,
3. Select the location in such a way that no outside light
shines onto the tool holder.
This can inhibit data transmission.
4. Lay the connection cable in such a way that there is no
danger that persons can trip.
5. Programming see document P2372JH.
7.3 Charge battery pack
Battery pack is only partly charged upon delivery.
It must be fully charged before initial use. See battery
pack instruction manual.
7.4 Changing LMC
Fig. 7-2: ESD workplace
Removing LMC
1. Remove the battery.
2. Slacken the screws (M4, DIN 912).
3. Carefully pull the LMC out of the handle and replace it.
Caution
Danger of hands being crushed.
Always use a reaction bar for applica-
tions in restricted space and torques
over 60 Nm.
If the data transmission has been inter-
rupted, the LCD display reports a synch
error.
Replace the tool in the tool holder.
The complete data transmission is ac-
knowledged on the display with
Rest 512
.
Note
Electrostatically sensitive component.
The electronic assemblies of the cordless
EC tool can be destroyed or damaged by
electrostatic discharge (ESD). This can
lead to immediate failure, or to malfunc-
tions at a later date.
Note handling instructions.
To avoid damage when changing the
LMC, make sure that there is a poten-
tial equalization between the person
and the tool.
Possibly set up equipment in an ESD-
protected environment. Recommenda-
tion for an ESD workplace: Electrically
conductive work surfaces, anti-static
straps, appropriate furniture, clothing
and footwear, as well as grounding of
all components.
LMC must only be changed with the bat-
tery is disconnected.
LiveWire 1
LiveWire 2