Section 4 — Commissioning
4-12
Part No. 750-363
4.10.2 Power-Up
1. Ensure the boiler is properly wired for the available power supply. Refer to the wiring diagram provided
with the boiler or to the appropriate wiring diagram in
Section 2 - Installation
.
2. Verify the voltage (control voltage is 115V-1Ph) to ensure it is within specifications.
4.10.3 Operation Check:
Gas Valve, Gas Pressure Switches, Combustion Air Proving Switch, Ignition Fail
Before initial firing of the burner, the gas valve, Low Gas Pressure Switch (LGPS), High Gas Pressure Switch
(HGPS), and Combustion Air Proving Switch (CAPS) should be checked for proper operation.
• Before proceeding, review
Section C - Control Setpoints
for initial LGPS, HGPS, and CAPS settings.
Note: Close the downstream manual gas shut-off valve before checking pressure switches and
CAPS.
While performing the following safety checks, use the Falcon Annunciation screen to monitor the status of
the circuits involved. Press <Annunciation> on the Operation page to access this screen.
LGPS
1. To check the Low Gas Pressure Switch, first close the upstream manual shutoff valve (both manual
shutoff valves should now be closed).
2. Start the burner and wait 10 seconds during purge for CAPS to be made.
3. Turn the LGPS setting to maximum.
4. Open the test cock to bleed the gas line.
5. The controller should lock out. The screen will indicate
Lockout 67 ILK OFF
.
6. Reset the controller and change the LGPS setting back to minimum to proceed.
Figure 4-10 Annunciation Screen
Содержание ClearFire CFLC Series
Страница 6: ...vi...
Страница 14: ...Section 1 Introduction 1 8 Part No 750 363...
Страница 16: ...Section 2 Installation 2 2 Part No 750 363...
Страница 36: ...Section 2 Installation 2 22 Part No 750 363 Figure 2 13 Electrical Connections CFLC FALCON...
Страница 38: ...Section 2 Installation 2 24 Part No 750 363...
Страница 56: ...Section 3 Stack and Intake Vent Sizing and Installation 3 18 Part No 750 363...
Страница 87: ...Section 6 Parts Part No 750 363 6 3 Figure 6 1 Boiler Mechanical Assembly CFLC 4000 5000...
Страница 88: ...Section 6 Parts 6 4 Part No 750 363 Figure 6 2 Boiler Mechanical Assembly CFLC 6000 8000...
Страница 90: ...Section 6 Parts 6 6 Part No 750 363 Figure 6 4 Burner Assembly CFLC 4000 5000 UV SCANNER SEE FIGURE 6 7...
Страница 91: ...Section 6 Parts Part No 750 363 6 7 Figure 6 5 Burner Assembly CFLC 6000 8000 UV SCANNER SEE FIGURE 6 7...
Страница 95: ...Section 6 Parts Part No 750 363 6 11 Figure 6 10 Gas Train CFLC 6000 8000 optional 9 PPM NOx...
Страница 97: ...Section 6 Parts Part No 750 363 6 13 Figure 6 12 Gas train CFLC 10000 12000 optional 9 PPM NOx...
Страница 98: ...Section 6 Parts 6 14 Part No 750 363 Figure 6 13 Gas Train CFLC 4000 5000 Propane...
Страница 99: ...Section 6 Parts Part No 750 363 6 15 Figure 6 14 Gas Train CFLC 6000 8000 Propane...
Страница 100: ...Section 6 Parts 6 16 Part No 750 363 Figure 6 15 Gas Train CFLC 10000 12000 Propane...
Страница 105: ...Section 6 Parts Part No 750 363 6 21 Figure 6 20 Control Panel...
Страница 106: ...Section 6 Parts 6 22 Part No 750 363 Figure 6 21 Cables and Cable Harness...
Страница 108: ...Section 6 Parts 6 24 Part No 750 363 Figure 6 23 Casing Insulation 4000 5000 cont d...
Страница 109: ...Section 6 Parts Part No 750 363 6 25 Figure 6 24 Casing Insulation 6000 8000...
Страница 110: ...Section 6 Parts 6 26 Part No 750 363 Figure 6 25 Casing Insulation 6000 8000 cont d...
Страница 115: ...APPENDIX A Falcon Parameters...
Страница 116: ......
Страница 123: ...APPENDIX B Variable Speed Drive Parameters Sections B 1 B 5 PowerFlex 400 Sections B 6 B 8 PowerFlex 525...
Страница 124: ......
Страница 144: ......
Страница 145: ...APPENDIX C Gas Valve Page C 3 Siemens Gas Valve Page C 25 Dungs Gas Valve CFLC 4000 5000...
Страница 146: ......
Страница 147: ...Appendix C Gas Valve C 3...
Страница 148: ...Gas Valve Appendix C C 4...
Страница 149: ...Appendix C Gas Valve C 5...
Страница 150: ...Gas Valve Appendix C C 6...
Страница 151: ...Appendix C Gas Valve C 7...
Страница 152: ...Gas Valve Appendix C C 8...
Страница 153: ...Appendix C Gas Valve C 9...
Страница 154: ...Gas Valve Appendix C C 10...
Страница 155: ...Appendix C Gas Valve C 11...
Страница 156: ...Gas Valve Appendix C C 12...
Страница 157: ...Appendix C Gas Valve C 13...
Страница 158: ...Gas Valve Appendix C C 14...
Страница 159: ...Appendix C Gas Valve C 15...
Страница 160: ...Gas Valve Appendix C C 16...
Страница 161: ...Appendix C Gas Valve C 17...
Страница 162: ...Gas Valve Appendix C C 18...
Страница 163: ...Appendix C Gas Valve C 19...
Страница 164: ...Gas Valve Appendix C C 20...
Страница 165: ...Appendix C Gas Valve C 21...
Страница 166: ...Gas Valve Appendix C C 22...
Страница 167: ...Appendix C Gas Valve C 23...
Страница 168: ...Appendix C Gas Valve C 24...
Страница 186: ...Appendix C Gas Valve C 42...
Страница 187: ...APPENDIX D Falcon Alert Hold and Lockout Codes...
Страница 188: ......
Страница 208: ......
Страница 210: ......
Страница 230: ...Falcon Lead Lag Appendix E E 22 Figure 10 Falcon Lead Lag with outdoor reset and EMS for remote enable...
Страница 231: ...Appendix E Falcon Lead Lag E 23 Figure 11 Falcon LL with EMS for remote enable remote setpoint...
Страница 232: ...Falcon Lead Lag Appendix E E 24 Figure 12 Falcon Lead Lag with EMS for remote comms monitoring...
Страница 244: ...Falcon Lead Lag Appendix E E 36 13 Boiler Wiring Diagrams Model CFC ClearFire condensing boiler...
Страница 245: ...Appendix E Falcon Lead Lag E 37 Model CFW ClearFire hydronic boiler...
Страница 282: ......
Страница 283: ...APPENDIX F Falcon Program Module...
Страница 284: ......
Страница 285: ...Appendix F Program Module F 3...
Страница 286: ...Program Module Appendix F F 4...
Страница 287: ...Appendix F Program Module F 5...
Страница 288: ...Program Module Appendix F F 6...
Страница 289: ......
Страница 290: ...e mail info cleaverbrooks com Web Address http www cleaverbrooks com...