Section 2 — Installation
Part No. 750-363
2-9
2.7.3 Gas Pressure Requirements
For proper and safe operation, each CFLC Series boiler requires a stable gas supply pressure. See table
below
for pressure requirements. Refer also to
APPENDIX C - GAS VALVE
.
Table 2-5 CFLC gas pressure requirements
*Listed max. pressures are
without
the use of a step-down regulator. The CFLC can accommodate higher
supply pressures with the addition of an upstream regulator:
CFLC 4000 - 5000
>1/2 psig requires step-down regulator
>5 psig requires overpressure protection
CFLC 6000 - 12000
>2 psig requires step-down regulator
>7 psig requires overpressure protection
When an upstream regulator is installed, required minimum pressures will be higher due to the pressure
drop across the regulator.
Actual gas pressure should be measured when the burner is firing using a manometer at the upstream test
port connection on the main gas valve. For a multiple unit installation, gas pressure should be set for a
single unit first, then the remaining units should be staged on to ensure that gas supply pressure drop is
not more than 7" w.c. and never below the required pressure. Fluctuating gas pressure readings could be
indicative of a faulty supply regulator or improper gas train piping to the boiler. Refer to Tables 2-6 and 2-
7 for gas piping recommendations.
To measure pilot gas pressure, use the test port on the pilot solenoid valve.
Gas Supply Pressure (at gas regulator outlet)
Natural Gas 20ppm
Natural Gas 9ppm
Propane
Boiler
size
Min
(“WC)
Max*
(“WC)
Min
(“WC)
Max*
(“WC)
Min
(“WC)
Max
(“WC)
Gas pilot pressure
(“WC)
4000
9
14
10
14
9
14
3-5
5000
9
14
10
14
9
14
3-5
6000
35
56
35
56
31
56
3-5
8000
35
56
42
56
31
56
3-5
10000
38
56
38
56
35
56
3-5
12000
38
56
40
56
35
56
3-5
Figure 2-4 Pilot train
VALVE
SOLENOID
PILOT
COCK
GAS SERVICE
Test Port
Содержание ClearFire CFLC Series
Страница 6: ...vi...
Страница 14: ...Section 1 Introduction 1 8 Part No 750 363...
Страница 16: ...Section 2 Installation 2 2 Part No 750 363...
Страница 36: ...Section 2 Installation 2 22 Part No 750 363 Figure 2 13 Electrical Connections CFLC FALCON...
Страница 38: ...Section 2 Installation 2 24 Part No 750 363...
Страница 56: ...Section 3 Stack and Intake Vent Sizing and Installation 3 18 Part No 750 363...
Страница 87: ...Section 6 Parts Part No 750 363 6 3 Figure 6 1 Boiler Mechanical Assembly CFLC 4000 5000...
Страница 88: ...Section 6 Parts 6 4 Part No 750 363 Figure 6 2 Boiler Mechanical Assembly CFLC 6000 8000...
Страница 90: ...Section 6 Parts 6 6 Part No 750 363 Figure 6 4 Burner Assembly CFLC 4000 5000 UV SCANNER SEE FIGURE 6 7...
Страница 91: ...Section 6 Parts Part No 750 363 6 7 Figure 6 5 Burner Assembly CFLC 6000 8000 UV SCANNER SEE FIGURE 6 7...
Страница 95: ...Section 6 Parts Part No 750 363 6 11 Figure 6 10 Gas Train CFLC 6000 8000 optional 9 PPM NOx...
Страница 97: ...Section 6 Parts Part No 750 363 6 13 Figure 6 12 Gas train CFLC 10000 12000 optional 9 PPM NOx...
Страница 98: ...Section 6 Parts 6 14 Part No 750 363 Figure 6 13 Gas Train CFLC 4000 5000 Propane...
Страница 99: ...Section 6 Parts Part No 750 363 6 15 Figure 6 14 Gas Train CFLC 6000 8000 Propane...
Страница 100: ...Section 6 Parts 6 16 Part No 750 363 Figure 6 15 Gas Train CFLC 10000 12000 Propane...
Страница 105: ...Section 6 Parts Part No 750 363 6 21 Figure 6 20 Control Panel...
Страница 106: ...Section 6 Parts 6 22 Part No 750 363 Figure 6 21 Cables and Cable Harness...
Страница 108: ...Section 6 Parts 6 24 Part No 750 363 Figure 6 23 Casing Insulation 4000 5000 cont d...
Страница 109: ...Section 6 Parts Part No 750 363 6 25 Figure 6 24 Casing Insulation 6000 8000...
Страница 110: ...Section 6 Parts 6 26 Part No 750 363 Figure 6 25 Casing Insulation 6000 8000 cont d...
Страница 115: ...APPENDIX A Falcon Parameters...
Страница 116: ......
Страница 123: ...APPENDIX B Variable Speed Drive Parameters Sections B 1 B 5 PowerFlex 400 Sections B 6 B 8 PowerFlex 525...
Страница 124: ......
Страница 144: ......
Страница 145: ...APPENDIX C Gas Valve Page C 3 Siemens Gas Valve Page C 25 Dungs Gas Valve CFLC 4000 5000...
Страница 146: ......
Страница 147: ...Appendix C Gas Valve C 3...
Страница 148: ...Gas Valve Appendix C C 4...
Страница 149: ...Appendix C Gas Valve C 5...
Страница 150: ...Gas Valve Appendix C C 6...
Страница 151: ...Appendix C Gas Valve C 7...
Страница 152: ...Gas Valve Appendix C C 8...
Страница 153: ...Appendix C Gas Valve C 9...
Страница 154: ...Gas Valve Appendix C C 10...
Страница 155: ...Appendix C Gas Valve C 11...
Страница 156: ...Gas Valve Appendix C C 12...
Страница 157: ...Appendix C Gas Valve C 13...
Страница 158: ...Gas Valve Appendix C C 14...
Страница 159: ...Appendix C Gas Valve C 15...
Страница 160: ...Gas Valve Appendix C C 16...
Страница 161: ...Appendix C Gas Valve C 17...
Страница 162: ...Gas Valve Appendix C C 18...
Страница 163: ...Appendix C Gas Valve C 19...
Страница 164: ...Gas Valve Appendix C C 20...
Страница 165: ...Appendix C Gas Valve C 21...
Страница 166: ...Gas Valve Appendix C C 22...
Страница 167: ...Appendix C Gas Valve C 23...
Страница 168: ...Appendix C Gas Valve C 24...
Страница 186: ...Appendix C Gas Valve C 42...
Страница 187: ...APPENDIX D Falcon Alert Hold and Lockout Codes...
Страница 188: ......
Страница 208: ......
Страница 210: ......
Страница 230: ...Falcon Lead Lag Appendix E E 22 Figure 10 Falcon Lead Lag with outdoor reset and EMS for remote enable...
Страница 231: ...Appendix E Falcon Lead Lag E 23 Figure 11 Falcon LL with EMS for remote enable remote setpoint...
Страница 232: ...Falcon Lead Lag Appendix E E 24 Figure 12 Falcon Lead Lag with EMS for remote comms monitoring...
Страница 244: ...Falcon Lead Lag Appendix E E 36 13 Boiler Wiring Diagrams Model CFC ClearFire condensing boiler...
Страница 245: ...Appendix E Falcon Lead Lag E 37 Model CFW ClearFire hydronic boiler...
Страница 282: ......
Страница 283: ...APPENDIX F Falcon Program Module...
Страница 284: ......
Страница 285: ...Appendix F Program Module F 3...
Страница 286: ...Program Module Appendix F F 4...
Страница 287: ...Appendix F Program Module F 5...
Страница 288: ...Program Module Appendix F F 6...
Страница 289: ......
Страница 290: ...e mail info cleaverbrooks com Web Address http www cleaverbrooks com...