
Falcon Lead Lag
Appendix E
E-12
2. Go to Lead Lag Master Configuration and make any necessary parameter changes. The first set of
parameters shown will be the following:
Master Enable
should be left at Disabled for now.
CH (steam) setpoint
is the system header temperature (pressure) that the lead lag system will
attempt to maintain.
CH (steam) time of day
is the setpoint used by the TOD/Night Setback routine, if utilized.
Modbus port
should be set to MB2
.
This is the port used by the Falcon Lead Lag Modbus network.
Remaining lead lag Master parameters are accessed by pressing <ADVANCED SETTINGS> and are
shown in Tables 2a (hydronic) and 2b (steam). Use the left and right arrow buttons near the top of
the screen to navigate through the parameter menus. Use the scroll bar on the right hand side of
the scren to scroll through the parameter lists.
Table 1a - Lead Lag Master Configuration Parameters (Hydronic)
Parameter
Range
CB Default Setting
Installation Setting
Master enable
Enabled
Disabled
Disabled
CH setpoint
-40 to 266 deg F (-40 to 130
deg C)
150 deg F
CH time of day setpoint
-40 to 266 deg F (-40 to 130
deg C)
120 deg F
Modbus port
MB1
MB2
No port
MB2
Table 1b - Lead Lag Master Configuration Parameters (Steam)
Parameter
Range
CB Default Setting
Installation Setting
Master enable
Enabled
Disabled
Disabled
Steam setpoint
0-135 psi
10 psi
Steam time of day setpoint
0-135 psi
0 psi
Modbus port
MB1
MB2
No port
MB2
Table 2a - Lead Lag Master Configuration Parameters - Advanced Settings, Hydronic
Parameter
Range
CB Default Setting
Installation Setting
Modulation Parameters
Modulation backup sensor
Lead outlet sensor
Slave outlet sensor average
Disabled
Slave outlet sensor
average
Off hysteresis
0 deg F to 234 deg F (-17 deg C to 112 deg C)
15
On hysteresis
0 deg F to 234 deg F (-17 deg C to 112 deg C)
5
Hysteresis step time
hr min sec
0 min
P gain
0-400
10
I gain
0-400
15
D gain
0-400
0
Central Heat Parameters
Содержание ClearFire CFLC Series
Страница 6: ...vi...
Страница 14: ...Section 1 Introduction 1 8 Part No 750 363...
Страница 16: ...Section 2 Installation 2 2 Part No 750 363...
Страница 36: ...Section 2 Installation 2 22 Part No 750 363 Figure 2 13 Electrical Connections CFLC FALCON...
Страница 38: ...Section 2 Installation 2 24 Part No 750 363...
Страница 56: ...Section 3 Stack and Intake Vent Sizing and Installation 3 18 Part No 750 363...
Страница 87: ...Section 6 Parts Part No 750 363 6 3 Figure 6 1 Boiler Mechanical Assembly CFLC 4000 5000...
Страница 88: ...Section 6 Parts 6 4 Part No 750 363 Figure 6 2 Boiler Mechanical Assembly CFLC 6000 8000...
Страница 90: ...Section 6 Parts 6 6 Part No 750 363 Figure 6 4 Burner Assembly CFLC 4000 5000 UV SCANNER SEE FIGURE 6 7...
Страница 91: ...Section 6 Parts Part No 750 363 6 7 Figure 6 5 Burner Assembly CFLC 6000 8000 UV SCANNER SEE FIGURE 6 7...
Страница 95: ...Section 6 Parts Part No 750 363 6 11 Figure 6 10 Gas Train CFLC 6000 8000 optional 9 PPM NOx...
Страница 97: ...Section 6 Parts Part No 750 363 6 13 Figure 6 12 Gas train CFLC 10000 12000 optional 9 PPM NOx...
Страница 98: ...Section 6 Parts 6 14 Part No 750 363 Figure 6 13 Gas Train CFLC 4000 5000 Propane...
Страница 99: ...Section 6 Parts Part No 750 363 6 15 Figure 6 14 Gas Train CFLC 6000 8000 Propane...
Страница 100: ...Section 6 Parts 6 16 Part No 750 363 Figure 6 15 Gas Train CFLC 10000 12000 Propane...
Страница 105: ...Section 6 Parts Part No 750 363 6 21 Figure 6 20 Control Panel...
Страница 106: ...Section 6 Parts 6 22 Part No 750 363 Figure 6 21 Cables and Cable Harness...
Страница 108: ...Section 6 Parts 6 24 Part No 750 363 Figure 6 23 Casing Insulation 4000 5000 cont d...
Страница 109: ...Section 6 Parts Part No 750 363 6 25 Figure 6 24 Casing Insulation 6000 8000...
Страница 110: ...Section 6 Parts 6 26 Part No 750 363 Figure 6 25 Casing Insulation 6000 8000 cont d...
Страница 115: ...APPENDIX A Falcon Parameters...
Страница 116: ......
Страница 123: ...APPENDIX B Variable Speed Drive Parameters Sections B 1 B 5 PowerFlex 400 Sections B 6 B 8 PowerFlex 525...
Страница 124: ......
Страница 144: ......
Страница 145: ...APPENDIX C Gas Valve Page C 3 Siemens Gas Valve Page C 25 Dungs Gas Valve CFLC 4000 5000...
Страница 146: ......
Страница 147: ...Appendix C Gas Valve C 3...
Страница 148: ...Gas Valve Appendix C C 4...
Страница 149: ...Appendix C Gas Valve C 5...
Страница 150: ...Gas Valve Appendix C C 6...
Страница 151: ...Appendix C Gas Valve C 7...
Страница 152: ...Gas Valve Appendix C C 8...
Страница 153: ...Appendix C Gas Valve C 9...
Страница 154: ...Gas Valve Appendix C C 10...
Страница 155: ...Appendix C Gas Valve C 11...
Страница 156: ...Gas Valve Appendix C C 12...
Страница 157: ...Appendix C Gas Valve C 13...
Страница 158: ...Gas Valve Appendix C C 14...
Страница 159: ...Appendix C Gas Valve C 15...
Страница 160: ...Gas Valve Appendix C C 16...
Страница 161: ...Appendix C Gas Valve C 17...
Страница 162: ...Gas Valve Appendix C C 18...
Страница 163: ...Appendix C Gas Valve C 19...
Страница 164: ...Gas Valve Appendix C C 20...
Страница 165: ...Appendix C Gas Valve C 21...
Страница 166: ...Gas Valve Appendix C C 22...
Страница 167: ...Appendix C Gas Valve C 23...
Страница 168: ...Appendix C Gas Valve C 24...
Страница 186: ...Appendix C Gas Valve C 42...
Страница 187: ...APPENDIX D Falcon Alert Hold and Lockout Codes...
Страница 188: ......
Страница 208: ......
Страница 210: ......
Страница 230: ...Falcon Lead Lag Appendix E E 22 Figure 10 Falcon Lead Lag with outdoor reset and EMS for remote enable...
Страница 231: ...Appendix E Falcon Lead Lag E 23 Figure 11 Falcon LL with EMS for remote enable remote setpoint...
Страница 232: ...Falcon Lead Lag Appendix E E 24 Figure 12 Falcon Lead Lag with EMS for remote comms monitoring...
Страница 244: ...Falcon Lead Lag Appendix E E 36 13 Boiler Wiring Diagrams Model CFC ClearFire condensing boiler...
Страница 245: ...Appendix E Falcon Lead Lag E 37 Model CFW ClearFire hydronic boiler...
Страница 282: ......
Страница 283: ...APPENDIX F Falcon Program Module...
Страница 284: ......
Страница 285: ...Appendix F Program Module F 3...
Страница 286: ...Program Module Appendix F F 4...
Страница 287: ...Appendix F Program Module F 5...
Страница 288: ...Program Module Appendix F F 6...
Страница 289: ......
Страница 290: ...e mail info cleaverbrooks com Web Address http www cleaverbrooks com...