11
CLEARSPAN
™
POLY BUILDINGS
Visit
www.ClearSpan.com
for additional products and customer assistance.
SQUARE THE ASSEMBLED FRAME
Gather the parts:
• Measuring tape and assistant
Complete these steps:
1. Square the frame by measuring diagonally corner-to-
corner and align all rafters as shown below.
2. Verify that the
on-center width of each rafter
is 18'.
FINISH ROUGH EDGES
Gather the parts:
• Duct tape
• Metal file (may not be needed)
1. Check for sharp edges on the frame. If present, file
these smooth so they will not cut the cover.
2. Apply two layers of heavy duct tape over all pipe
connections and clamps that may contact the cover.
3. Install band clamps for the cabling.
NOTE:
The frame is square when the two diagonal
measurements are equal.
3. Check the frame for sharp edges.
ATTACH BAND CLAMPS FOR CABLING
Cables attached to both ends of the shelter provide the
diagonal bracing for the shelter. Band clamps secure the
cable bracing to the shelter.
Six (6) band clamps (#103856) are used on each side of
the frame to secure the cable ends. Consult the diagram
below and in the Quick Start section for cable locations.
Complete these steps to install the band clamps:
1. Remove the nut and bolt from the clamp, carefully bend
the band clamp open, and slide it over rafter in the
proper location.
2. With the clamp in place, use a channel lock pliers to
squeeze the clamp back into shape and reinstall the
bolt and nut.
Do not fully tighten at this time.
Band Clamp
Band Clamp
Band Clamp
Band Clamp
Side view - Length shown may differ from actual shelter.
Lower Purlin
Band
Clamp
Upper Purlin
Band
Clamp
Band Clamp Location
Frame shown above may be a different length.
Top View
3. Slightly tighten the nut and bolt or use a small piece of
duct tape to hold the clamp in position.
4. Continue by assembling the cables.