Using the isolation pad as a template, mark on the panel(s) of the raised floor the 4 holes where the frame is going to
be secured to the floor. Using a 5/8” drill bit, drill a hole through each of the oblong marks you made with the isolation
pad.
Take the threaded rods from the raised floor mounting kit and slide one through each of the holes. Using a hammer
and holding them perpendicular to the floor, tap on the end firmly. The goal is to make a “mark” on the concrete floor
visible enough to see where the 4 holes should be drilled.
Once the concrete floor is marked, remove the threaded rods and floor panels. Using a 5/8” masonry bit, drill the four
required holes to a minimum depth of 2” (approx. 50mm).
Note:
If for some reason you have trouble drilling the 5/8” hole, we
recommend first drilling a 1/4” pilot hole before drilling out to 5/8”.
Thoroughly clean the dust from each hole, using a vacuum or blowout
air bulb.
Note:
To not degrade the anchor’s installed performance, any unused
anchor holes (or other nearby holes) in the concrete within 3” must be
filled with an epoxy filler (pour stone) or equivalent. Filled holes must be fully cured before anchors are installed and
torqued.