Place the floor panels into position, and tighten the previously installed nuts below the raised panel until they make
contact with the panel. Put the isolation pad into place (isolation pad may look different than example).
Lift the frame into place.
Place the square washers onto each rod. Align the edges of the 2” square washer parallel with the slots in the frame
base to obtain the maximum material overlap. Install the isolation washers (packaged with the isolation pad) onto each
rod.
Install the remaining hardware (washers, nuts, etc) from the raised floor installation kit.