SECTION 4: CTB INSTALLATION (continued) .............................................................
Installing the Pressure Relief Oil Line Back to the Tank ..................................................... 4-15
Installing the Pressure Oil Line Components ...................................................................... 4-16
Installing the Compressed Air Line .................................................................................... 4-16
Wiring the Coil Tube Boiler .............................................................................................. 4-17
Wiring to the Oil Pump ..................................................................................................... 4-18
Wiring the Load Loop Circulator ...................................................................................... 4-18
Installing the Stack ........................................................................................................... 4-19
Installing the Interior Stack ......................................................................................... 4-20
Installing the Barometric Damper ............................................................................... 4-21
Installing the Stack Safety Switch For Canadian Installations ....................................... 4-23
Resetting the Stack Safety Switch ........................................................................ 4-24
Understanding the Function of the Stack Safety Switch ......................................... 4-24
Installing the Stack Penetration ................................................................................... 4-25
Installing the Exterior Stack ........................................................................................ 4-25
Installing the Stack Cap ............................................................................................. 4-25
Installing the Draft Inducer ................................................................................................ 4-25
Installing the Wall Thermostat ........................................................................................... 4-27
Replacing the Wall Thermostat Batteries .................................................................... 4-27
Inspecting the CTB Installation ......................................................................................... 4-28
SECTION 5: METERING PUMP PRIMING ................................................................ 5-1
Understanding Metering Pump Priming .......................................................................... 5-1
Required Tools and Materials ...................................................................................... 5-1
Priming the Metering Pump ................................................................................................. 5-2
Vacuum Testing the Oil Pump ............................................................................................. 5-4
SECTION 6: STARTING AND ADJUSTING THE BURNER ...................................... 6-1
Understanding Burner Startup and Adjustment ............................................................... 6-1
Preparing the Hydronics System for Burner Startup ........................................................ 6-1
Preparing the Burner for Startup ...................................................................................... 6-1
Starting the Burner ........................................................................................................... 6-3
SECTION 7: RESETTING THE OIL PRIMARY CONTROL ....................................... 7-1
Understanding the Oil Primary Control ........................................................................... 7-1
Resetting the Oil Primary Control (CB-200-CTB) .............................................................. 7-1
Resetting the Oil Primary Control (CB-350-CTB and CB-500-CTB) ................................. 7-2
Primary Control Operation/Troubleshooting Guide (CB-350-CTB and CB-500-CTB) ....... 7-4
SECTION 8: ADJUSTING THE DRAFT OVER FIRE ................................................ 8-1
Understanding the Importance of Draft ............................................................................... 8-1
Checking for Correct Draft Over Fire ................................................................................. 8-1
Understanding the Effect of Exhaust Fans on Draft ....................................................... 8-2
Checking Draft Over Fire to Determine Severity of Backdraft ...................................... 8-2
Combustion Air Requirements ..................................................................................... 8-3
Adjusting Draft Over Fire With A Draft Inducer Installed .................................................... 8-3
Air for Combustion and Ventilation ..................................................................................... 8-4
TABLE OF CONTENTS
Содержание CB-200-CTB
Страница 2: ......
Страница 4: ......
Страница 20: ...CoilTubeBoilerOperator sManual ModelsCB 200 CTB CB 350 CTB andCB 500 CTB 1 12 ...
Страница 24: ...CoilTubeBoilerOperator sManual ModelsCB 200 CTB CB 350 CTB andCB 500 CTB 2 4 ...
Страница 72: ...CoilTubeBoilerOperator sManual ModelsCB 200 CTB CB 350 CTB andCB 500 CTB 5 6 ...
Страница 78: ...CoilTubeBoilerOperator sManual ModelsCB 200 CTB CB 350 CTB andCB 500 CTB 6 6 ...
Страница 82: ...CoilTubeBoilerOperator sManual ModelsCB 200 CTB CB 350 CTB andCB 500 CTB 7 4 ...
Страница 86: ...CoilTubeBoilerOperator sManual ModelsCB 200 CTB CB 350 CTB andCB 500 CTB 8 4 ...
Страница 108: ...CoilTubeBoilerOperator sManual ModelsCB 200 CTB CB 350 CTB andCB 500 CTB 11 8 ...
Страница 117: ...CoilTubeBoilerOperator sManual ModelsCB 200 CTB CB 350 CTB andCB 500 CTB A 9 ...
Страница 132: ...CoilTubeBoilerOperator sManual ModelsCB 200 CTB CB 350 CTB andCB 500 CTB A 24 CB 200 CTB 43 I88961 B 60 7 17 ...
Страница 134: ...CoilTubeBoilerOperator sManual ModelsCB 200 CTB CB 350 CTB andCB 500 CTB A 26 CB 350 CTB I88962 B 44 45 64 8 18 ...
Страница 140: ...CoilTubeBoilerOperator sManual ModelsCB 200 CTB CB 350 CTB andCB 500 CTB A 32 ...
Страница 148: ...CoilTubeBoilerOperator sManual ModelsCB 200 CTB CB 350 CTB andCB 500 CTB C 2 ...