
Coil Tube Boiler Operator's Manual: Models CB-200-CTB, CB-350-CTB, and CB-500-CTB
4-16
Installing the Compressed Air Line
NOTE:
Your air compressor system must supply air pressure to the boiler with the following
requirements:
25 psi
and
water trap or dryer.
If you do not have shop air, an optional air compressor is
available. Contact your local Clean Burn dealer for more information.
1.
Run a compressed air line from your shop air to the burner on the boiler. Use minimum 1/4"
O.D. copper tubing or equivalent for the compressed air line.
2.
Install an easily accessible shut-off valve in the air line so the burner can be serviced without
shutting off the shop air in your service area.
3.
Install a pressure regulator (additional to the burner air regulator) in the air line, and set it at 50 psi.
ATTENTION:
DO NOT feed full shop air pressure to the burner or damage to burner
components may occur.
4.
Install a water trap or extractor/dryer in the air line with an automatic drain so compressed air
(rather than water) is supplied to the burner.
ATTENTION:
Water must not be fed to the burner, or the flame will be extinguished and the
burner will shut down. Be sure to drain water from your compressor tank on a regular basis to
keep water out of the air line.
ATTENTION:
It is critical that you adhere to the following specifications for pressure oil line
installation (oil line from the pump to the boiler); if these specifications are not met, the metering pump
will not function correctly and the burner will shut down on reset.
•
The parameters for pressure oil line installation are:
Length of Pressure Line
Line Size
Up to 100 feet
3/8" O.D. copper or aluminum tubing
(Please note that some installations will allow for a greater pressure line length. Contact your
Authorized Clean Burn Distributor for more information.)
•
If possible, the pressure oil line should slant up to the burner
with no loops or high points to
trap air.
•
Local codes may require the installation of an in-line
"Fire-O-Matic" safety valve
.
Be sure to check all appropriate codes to ensure compliance.
1.
Refer to Figures 4A, 4B, and 4F.
2.
Make sure you have purchased all the necessary fittings to complete the installation correctly.
3.
Install the fittings and components as shown in the related illustrations. Be sure to use Permatex #2
non-hardening gasket sealer to seal every threaded fitting. DO NOT use teflon tape or teflon pipe dope
compounds.
Installing the Pressure Oil Line Components
Содержание CB-200-CTB
Страница 2: ......
Страница 4: ......
Страница 20: ...CoilTubeBoilerOperator sManual ModelsCB 200 CTB CB 350 CTB andCB 500 CTB 1 12 ...
Страница 24: ...CoilTubeBoilerOperator sManual ModelsCB 200 CTB CB 350 CTB andCB 500 CTB 2 4 ...
Страница 72: ...CoilTubeBoilerOperator sManual ModelsCB 200 CTB CB 350 CTB andCB 500 CTB 5 6 ...
Страница 78: ...CoilTubeBoilerOperator sManual ModelsCB 200 CTB CB 350 CTB andCB 500 CTB 6 6 ...
Страница 82: ...CoilTubeBoilerOperator sManual ModelsCB 200 CTB CB 350 CTB andCB 500 CTB 7 4 ...
Страница 86: ...CoilTubeBoilerOperator sManual ModelsCB 200 CTB CB 350 CTB andCB 500 CTB 8 4 ...
Страница 108: ...CoilTubeBoilerOperator sManual ModelsCB 200 CTB CB 350 CTB andCB 500 CTB 11 8 ...
Страница 117: ...CoilTubeBoilerOperator sManual ModelsCB 200 CTB CB 350 CTB andCB 500 CTB A 9 ...
Страница 132: ...CoilTubeBoilerOperator sManual ModelsCB 200 CTB CB 350 CTB andCB 500 CTB A 24 CB 200 CTB 43 I88961 B 60 7 17 ...
Страница 134: ...CoilTubeBoilerOperator sManual ModelsCB 200 CTB CB 350 CTB andCB 500 CTB A 26 CB 350 CTB I88962 B 44 45 64 8 18 ...
Страница 140: ...CoilTubeBoilerOperator sManual ModelsCB 200 CTB CB 350 CTB andCB 500 CTB A 32 ...
Страница 148: ...CoilTubeBoilerOperator sManual ModelsCB 200 CTB CB 350 CTB andCB 500 CTB C 2 ...