![Claydon Hybrid Front Hopper Скачать руководство пользователя страница 32](http://html.mh-extra.com/html/claydon/hybrid-front-hopper/hybrid-front-hopper_operators-manual-and-parts-manual_2619777032.webp)
Front Hopper
[30]
M.3.LFH
Left fert metering
unit is not going
around
(Seed & fert drill with 2
motors each driving 2
metering unit)
Is fert left metering unit
rotating when motor rotates
Sensor & target functioning
and correct
PPR value programmed
correctly
Wiring between sensor and
connection box is correct
Wiring between connection
box and CAN module is
correct
Check sensor on metering
unit
M.3.SLH
Left seed metering
unit is not going
around
(Drill with 1 motor
driving 2 metering
units)
Is seed left metering unit
rotating when motor rotates
Is drill being operated at ½
width?
Sensor & target functioning
and correct
PPR value programmed
correctly
Wiring between sensor and
connection box is correct
Wiring between connection
box and CAN module is
correct
Check sensor on metering
unit
M.3.RSH
Right seed metering
unit is not going
around
(Drill with 1 motor
driving 2 metering
units)
Is seed right metering unit
rotating when motor rotates
Is drill being operated at ½
width?
Sensor & target functioning
and correct
PPR value programmed
correctly
Wiring between sensor and
connection box is correct
Wiring between connection
box and CAN module is
correct
Check sensor on metering
unit
M.4.S
Motor speed signal
from seed motor not
being received
Motor being
operated and pulses
received from shaft
confirmation sensors
but no motor speed
signal
Signs of mechanical damage
to encoder or cabling on
motor
3way connector between
motor and harness is correct
Wiring between 3way
connector and module
connector is correct
Содержание Hybrid Front Hopper
Страница 35: ...Front Hopper 33 Appendix B Declaration of Conformity ...
Страница 41: ...Front Hopper 39 ...
Страница 43: ...Front Hopper 41 Part s Manual ...
Страница 44: ...Front Hopper 42 Front Hopper Tank Assembly ...