Front Hopper
[13]
9.4 Navigating the Control Unit (brief guide)
This is a brief guide to using the RDS Artemis Control Unit while in work. The RDS manual
supplied with the machine should be read for full instructions. The Artemis display has 3 main
screens which can be selected using the arrow buttons on the right hand side of the display.
The screens are ‘Main’, ‘Rate’ and Info.
1.
Press to select Main screen
2.
Press to select Rate setting screen
3.
Press to select Info page
Figure 6 – Screen selection
9.4.1 Main Screen
An overview of the Artemis Main screen can be seen in Figure 7; this screen will be displayed
when the control box is first turned on and whilst in work. Figure 8 displays the navigation
buttons located on the Artemis box.
1.
Time
2.
Area cut out status
(√ = In work, X = Out of work)
3.
Tramline number
4.
Fan speed 1 displayed (rpm)
5.
Forward speed
6.
Manual Override Seed
Metering (On/Off)
7.
Manual Override Fertiliser
Metering (On/Off)
8.
Seed rate
Figure 7 – Main screen indications
Содержание Hybrid Front Hopper
Страница 35: ...Front Hopper 33 Appendix B Declaration of Conformity ...
Страница 41: ...Front Hopper 39 ...
Страница 43: ...Front Hopper 41 Part s Manual ...
Страница 44: ...Front Hopper 42 Front Hopper Tank Assembly ...