Administration: Diagnostics
Testing Copper Ports
85
Cisco Small Business 300 Series Managed Switch Administration Guide
7
•
(Optional) Disable EEE (see the Port Management > Green Ethernet >
Properties page)
Use a CAT5 data cable when testing cables using (VCT).
Accuracy of the test results can have an error range of +/- 10 for Advanced Testing
and +/- 2 for basic testing.
!
CAUTION
When a port is tested, it is set to the Down state and communications are
interrupted. After the test, the port returns to the Up state. It is not recommended
that you run the copper port test on a port you are using to run the web-based
switch configuration utility, because communications with that device are
disrupted.
To test copper cables attached to ports:
STEP 1
Click
Administration
>
Diagnostics
>
Copper Test
.
STEP 2
Select the port on which to run the test.
STEP 3
Click Copper Test.
STEP 4
When the message appears, click
OK
to confirm that the link can go down or
Cancel
to abort the test.
The following fields are displayed in the Test Results block:
•
Last Update
—Time of the last test conducted on the port.
•
Test Results
—Cable test results. Possible values are:
-
OK
—Cable passed the test.
-
No Cable
—Cable is not connected to the port.
-
Open Cable
—Cable is connected on only one side.
-
Short Cable
—Short circuit has occurred in the cable.
-
Unknown Test Result
—Error has occurred.
•
Distance to Fault
—Distance from the port to the location on the cable where
the fault was discovered.
•
Operational Port Status
—Displays whether port is up or down.
Содержание Small Business 300
Страница 1: ...Cisco Small Business 300 Series Managed Switch Administration Guide Release 1 3 ADMINISTRATION GUIDE ...
Страница 17: ...Cisco Small Business 300 Series Managed Switch Administration Guide 16 Contents ...
Страница 28: ...Getting Started Window Navigation 11 Cisco Small Business 300 Series Managed Switch Administration Guide 1 ...
Страница 44: ...Status and Statistics Managing RMON 27 Cisco Small Business 300 Series Managed Switch Administration Guide 2 ...
Страница 192: ...Smartport Built in Smartport Macros 175 Cisco Small Business 300 Series Managed Switch Administration Guide 10 ...
Страница 200: ...Port Management PoE Configuring PoE Settings 183 Cisco Small Business 300 Series Managed Switch Administration Guide 11 ...
Страница 376: ...Security Dynamic ARP Inspection 359 Cisco Small Business 300 Series Managed Switch Administration Guide 17 ...
Страница 428: ...Access Control Defining ACL Binding 411 Cisco Small Business 300 Series Managed Switch Administration Guide 21 ...
Страница 462: ...Quality of Service Managing QoS Statistics 445 Cisco Small Business 300 Series Managed Switch Administration Guide 22 ...
Страница 482: ...SNMP SNMP Notification Filters 465 Cisco Small Business 300 Series Managed Switch Administration Guide 23 ...