3-31
Cisco RF Gateway 10 Hardware Installation Guide
OL-16264-04
Chapter 3 Cisco RFGW-10 UEQAM Installation
Connecting the Lineage Power Shelf to the Cisco RFGW-10
Steps
Caution
Do not connect the AC power cables to the facility power sources until the DC power cables are
connected to the power shelf, and to the Cisco RFGW-10 UEQAM.
To connect a single power shelf to the DC PEM modules on the Cisco RFGW-10:
Step 1
Connect the Y-Shaped DC power cables to the Lineage power shelf, see the
Step 2
Connect the DC power cables to the DC-input terminals on the Cisco RFGW-10 UEQAM. For
information on connecting the DC power cables to the Cisco RFGW-10, see the
Power to Cisco RFGW-10 UEQAM” section on page 3-22.
Step 3
Connect the AC power cables to a standard wall socket (facility power source) to provide power to the
Cisco RFGW-10. See the
“Powering On the Cisco RFGW-10 UEQAM” section on page 3-28
shows the Lineage power shelf connected to the DC PEM modules.
Figure 3-22
Lineage Power Shelf Connected to DC PEM Modules - Configuration 1
1
2
3
2
3
5
5
6
4
334292
Содержание RFGW-10
Страница 8: ...R E V I E W D R A F T C I S C O C O N F I D E N T I A L Contents viii Book Title OL 16264 04 ...
Страница 14: ...6 Cisco RF Gateway 10 Hardware Installation Guide OL 16264 04 ...
Страница 106: ...4 4 Cisco RF Gateway 10 Hardware Installation Guide OL 16264 04 Chapter 4 Thermal Management Environmental Monitoring ...