3-29
Cisco RF Gateway 10 Hardware Installation Guide
OL-16264-04
Chapter 3 Cisco RFGW-10 UEQAM Installation
Connecting the Lineage Power Shelf to the Cisco RFGW-10
Cabling the Power Shelf
Prerequisites
•
It is recommended that you use the AC-input, and DC power cables that are provided in the Lineage
power shelf accessory kit.
Required Tools and Equipment
•
Lineage AC-DC power shelf
•
DC power cables, provided in the Lineage accessory kit
•
AC-input power cables, provided in the Lineage accessory kit
•
10 mm hex socket driver
Steps
Warning
Before performing any of the following procedures, ensure that power is removed from the
DC circuit.
Statement 1003
Caution
Do not connect the AC power cables to the facility power source until the DC power cables are connected
to the power shelf, and to the Cisco RFGW-10 UEQAM.
To attach the cables to Lineage power shelf:
Step 1
Open the safety covers from above the DC terminal blocks by pushing the safety cover up and off the
DC power terminal blocks on the power shelf.
Step 2
Loosen and remove the M6 nuts on the DC terminal blocks.
Step 3
Connect the DC power cables by attaching the lugged ends of cables to the DC power terminal blocks
on the shelf. Secure the cables with the M6 nuts using a 10 mm hex socket driver with an installation
torque of 45-in lbs. (See
.)
Figure 3-21
Y-Shaped DC Power Cable with Lugged Ends
282975
2
3
1
Содержание RFGW-10
Страница 8: ...R E V I E W D R A F T C I S C O C O N F I D E N T I A L Contents viii Book Title OL 16264 04 ...
Страница 14: ...6 Cisco RF Gateway 10 Hardware Installation Guide OL 16264 04 ...
Страница 106: ...4 4 Cisco RF Gateway 10 Hardware Installation Guide OL 16264 04 Chapter 4 Thermal Management Environmental Monitoring ...