2-20
Cisco RF Gateway 10 Hardware Installation Guide
OL-16264-04
Chapter 2 Preparing Your Site for Installation
Checking the Shipping Container Contents
Step 3
Perform a visual inspection of the chassis.
Step 4
After you have unpacked the system verify that you have received all of the required components. Using
the packing list as a guide, take the following steps to check the contents of the Cisco RFGW-10
UEQAM shipping container:
Step 5
Check the contents of the boxes containing accessory items. Verify that you have received all equipment
listed in your order.
Step 6
Check that all Cisco RFGW-10 UEQAM components and DC PEM you ordered are installed in the
chassis. Ensure that the configuration matches the packing list.
Checking the Shipping Container Contents
Use the components list to check the contents of the Cisco RFGW-10 UEQAM shipping container. (See
.) Do not discard the shipping container. You need the container if you move or ship the Cisco
RFGW-10 UEQAM in the future.
Содержание RFGW-10
Страница 8: ...R E V I E W D R A F T C I S C O C O N F I D E N T I A L Contents viii Book Title OL 16264 04 ...
Страница 14: ...6 Cisco RF Gateway 10 Hardware Installation Guide OL 16264 04 ...
Страница 106: ...4 4 Cisco RF Gateway 10 Hardware Installation Guide OL 16264 04 Chapter 4 Thermal Management Environmental Monitoring ...