3-25
Cisco RF Gateway 10 Hardware Installation Guide
OL-16264-04
Chapter 3 Cisco RFGW-10 UEQAM Installation
Connecting Power to Cisco RFGW-10 UEQAM
Step 2
Ensure that the DC PEM is disconnected from the chassis midplane power connector and that the power
supply breaker is in the off position.
Step 3
Locate the stud on the DC PEM for the GND connection, which must be connected first and follow these
steps:
a.
Using the provided grounding lug in the accessory kit, replace the washers and Kepnut screw in the
following order:
–
Washer
–
Grounding cable lug
–
Kepnut screw
b.
Tighten the Kepnut screws on the power supply studs to the recommended torque of 18 in-lbs
minimum to 22 in-lbs maximum.
Figure 3-19
Cisco RFGW-10 DC PEM
1
DC PEM captive screws
5
Fan
2
DC PEM On (|) /Off (O) switch
6
DC PEM handle
3
Earth grounding symbol
7
DC PEM LEDs
4
DC PEM earth ground lug
8
DC PEM terminal and plastic cover
273687
1
2
4
3
5
6
7
1
8
Содержание RFGW-10
Страница 8: ...R E V I E W D R A F T C I S C O C O N F I D E N T I A L Contents viii Book Title OL 16264 04 ...
Страница 14: ...6 Cisco RF Gateway 10 Hardware Installation Guide OL 16264 04 ...
Страница 106: ...4 4 Cisco RF Gateway 10 Hardware Installation Guide OL 16264 04 Chapter 4 Thermal Management Environmental Monitoring ...