Chapter 2 Installing the GoQAM
24
4004834 Rev D
Install the Modulator Into a Rack
The front bezel of the GoQAM mounts to the front of the equipment rack. The
GoQAM fits into an EIA RS-310 rack mount.
Important!
You
must
read the preceding section,
Stacking Guidelines
(on page 20),
before installing the modulators into the rack.
Installation Requirements
This section lists the power, rack, and environmental conditions necessary for
installation.
Power Requirements Table
The following table describes the power specifications for the GoQAM.
Item
Specification
Supply Voltage
90V to 130V AC @ 47 to 63 Hz (AC unit)
180V to 264V AC @ 47 to 63 Hz (AC unit)
–42V to –57V DC (DC unit)
Fuses
4.0 A SLO BLO 250V (AC unit)
6.3 A SLO BLO 250V (DC unit)
Line Frequency
47 Hz to 63 Hz (AC unit only)
Power Required
RF GoQAM: 155 VA (typical)
IF GoQAM: 85 VA (typical)
Power Dissipated
RF GoQAM: 151 Watts (typical)
IF GoQAM: 81 VA (typical)
In Rush Current
35 amps maximum, Vin = 130V AC (AC unit)
75 amps maximum, Vin = 264V AC (AC unit)
15 amps maximum, Vin = -57V DC (DC unit)
Содержание GoQAM
Страница 1: ...GoQAM Modulator RF Output and IF Output Hardware Installation and Operation Guide ...
Страница 2: ......
Страница 8: ......
Страница 14: ......
Страница 30: ......
Страница 52: ......
Страница 67: ...Provision GoQAMs on the DNCS 4004834 Rev D 51 ...
Страница 68: ......
Страница 116: ......
Страница 138: ......
Страница 164: ......
Страница 176: ......