Installation Process Summary
4004834 Rev D
17
Stage
Process
See Procedure
8
Define the MPEG sources and
provision the GoQAM using DNCS
Element Provisioning according to
your network wiring diagram.
Provision the RF GoQAM
(on
page 37)
Provision the IF GoQAM
(on page
53)
Digital Network Control System
Online Help
9
Power on the GoQAM
N/A
10
Ensure that the GoQAM boots
correctly and check for alarms from the
front panel.
Understand the Boot Process
(on
page 78)
Troubleshooting Alarm Messages
(on page 134)
Troubleshooting Boot Screen Error
Messages
(on page 143)
11
Connect the RF or IF output ports.
Connect the RF OUT or IF OUT Ports
(on page 33)
12
Set the power output level in
accordance with your network wiring
diagram and spectrum analyzer
measurements.
Adjust the RF Output Level of a
Selected Carrier
(on page 87)
Adjust the IF Output Level of a
Selected Carrier
(on page 110)
13
If sessions have been defined for the
GoQAM path, verify the correct
session count by pressing the
OPTIONS button.
RF:
Viewing the Session Count
(on
page 91)
IF:
Viewing the Session Count
(on
page 114)
14
If encrypted, check the program count.
RF:
Viewing the Program Count
(on page 91)
IF:
Viewing the Program Count
(on
page 114)
15
Verify video and audio from a local
DHCT.
See the post-upgrade procedures for
your current System Release contained
in the upgrade installation
instructions.
Содержание GoQAM
Страница 1: ...GoQAM Modulator RF Output and IF Output Hardware Installation and Operation Guide ...
Страница 2: ......
Страница 8: ......
Страница 14: ......
Страница 30: ......
Страница 52: ......
Страница 67: ...Provision GoQAMs on the DNCS 4004834 Rev D 51 ...
Страница 68: ......
Страница 116: ......
Страница 138: ......
Страница 164: ......
Страница 176: ......