80
Raption 50 Series Installation Manual
The unit needs regular maintenance and part inspection during its life.
Before starting with the maintenance or with the part replacement procedure, it is
very important to disconnect Charging station from any power source.
Pay attention if you see the following symbols to prevent electrical hazards.
When performing some inspection and servicing at the equipment, except if
is absolutely necessary, make sure to switch OFF all circuit breakers before
starting to work.
The charger contains electric, mechanical and consumable components that must
be periodically checked, in order to keep the correct operation of the Charging
Station and keep it in the best conditions thoughout its useful lifetime.
This section informs how to perform the preventive maintenance, the frecuency in
doing it and the components to verify inside the charger.
To perform the first inspection of the Raption and the preventive maintenance,
please see the “Wear check list DC chargers”
8
Raption 50 Series Service Manual
Содержание Raption 50 Gen2 Series
Страница 1: ...Service Manual Raption 50 Gen2 Series ...
Страница 2: ......
Страница 4: ...0 ...
Страница 7: ...03 8 Maintenance 80 9 Annexes 84 10 Technical data 86 11 Need help 90 ...
Страница 12: ...08 Raption 50 Series Service Manual B Dimensions Units specified in millimeters ...
Страница 14: ...10 Raption 50 Series Service Manual 1 ELECTRONIC BOARDS ETC UPPER PART ...
Страница 16: ...12 Raption 50 Series Service Manual 2 POWER MODULES MEDIUM PART 1 7 2 3 4 6 5 13 8 9 12 11 10 ...
Страница 21: ...17 6 BLOCK DIAGRAM ...
Страница 23: ...19 Raption 50 Series Service Manual ...
Страница 55: ...51 ...
Страница 94: ...90 Raption 50 Series Instruction Manual 11 Raption 50 Series Service Manual ...