EES3 Hardware Interface Description
Contents
EES3_HD_v01.100b
Page 3 of 118
2009-08-12
Confidential / Released
Contents
Directives and Standards.................................................................... 14
SAR requirements specific to portable mobiles .................................. 16
Safety Precautions.............................................................................. 17
Power Supply................................................................................................... 25
3.2.1
Minimizing Power Losses ................................................................... 25
Measuring the Supply Voltage VBATT+ ............................................. 26
Monitoring Power Supply by AT Command ........................................ 26
Turn on EES3 Using Ignition Line IGT ................................ 27
Configuring the IGT Line for Use as ON/OFF Switch.......... 30
Turn on EES3 Using the VCHARGE Signal........................ 30
Reset EES3 via AT+CFUN Command ................................ 31
Reset or Turn off EES3 in Case of Emergency................... 31
Signal States after Startup .................................................................. 32
Turn off EES3 Using AT Command..................................... 34
Turn on/off EES3 Applications with Integrated USB ........... 36
Automatic Shutdown ........................................................................... 36
3.3.4.1
Thermal Shutdown .............................................................. 37
Deferred Shutdown at Extreme Temperature Conditions.... 38
Undervoltage Shutdown ...................................................... 38
Overvoltage Shutdown ........................................................ 39
Automatic GPRS Multislot Class Change ........................................................ 40
Hardware Requirements ..................................................................... 41
Software Requirements ...................................................................... 41
Battery Pack Requirements ................................................................ 42
Batteries Tested for Use with EES3.................................................... 43