6-8
D4K35 Setup Guide
020-100855-02 Rev. 1 (09-2014)
Section 6: Maintenance
6.12 Replace the Liquid Cooling Air Filter
The radiator air filter is located on left/front side of the projector behind a small air filter cover.
1. Release a single tab on the air filter cover and remove.
2. Slide the air filter out and discard. Insert the new air filter with the air flow indicator facing toward the
projector.
NOTE
:
Never reuse an old air filter. The air filters in this product cannot be cleaned thoroughly
enough for reuse and can lead to the contamination of optical components.
6.13 Replace the Lens
1. Tap and hold the red power button
on the TPC
Main
panel to turn the lamp and projector off.
2. Allow the lamp to cool for a minimum of 10 minutes.
3. Unplug the projector
4. Turn the lens clamp to the OPEN/UP position.
5. Release the lens locking lever (UP position).
6.
Pull out the lens and replace it with a different high-brightness lens.
NOTE
: Always install the lens with
“UP” label in the top position. This will assist in achieving consistent boresight alignment each time the
lens is replaced.
See
Section 2.11 Install the Primary Lens
.
7. Secure the lens with the lens locking lever (DOWN position).
8. Calibrate the lens.
Содержание D4K35
Страница 1: ...D4K35 S e t u p G u i d e 020 100855 02...
Страница 2: ......
Страница 3: ...D4K35 S e t u p G u i d e 020 100855 02...
Страница 8: ......
Страница 12: ......
Страница 40: ......
Страница 48: ......
Страница 50: ......
Страница 64: ......
Страница 65: ......