![CHOWEL PATC--150A-EU Скачать руководство пользователя страница 64](http://html1.mh-extra.com/html/chowel/patc-150a-eu/patc-150a-eu_instruction-manual_2603266064.webp)
CHOWEL / PATC-150A-EU
- 55 -
8-4. Quarterly
①
Insulation test must be done between primary and secondary of transformer.
②
Check water system thoroughly and replace components, which show wear or
corrosion.
③
Tighten all connections for good contact.
④
Check air gauges and regulators with pressure indicator.
⑤
Clean or replace airline mufflers, lubricator and filter.
⑥
Confirm the safety by checking safety main hanger (Eye bolt-M24) and aid hanger
(Eye nut-M12).
8-5. Annually
Disassemble the contacting face in between primary and secondary conductor of
welding transformer to have met with perfect requirement after clean up.
Содержание PATC--150A-EU
Страница 20: ...CHOWEL PATC 150A EU 11 Pulsation 1 9 times...
Страница 65: ...CHOWEL PATC 150A EU 56 1 Weld program sheet...
Страница 67: ...CHOWEL PATC 150A EU 58 3 I O connection diagram...
Страница 68: ...CHOWEL PATC 150A EU 59 4 RC 05 wiring diagram...
Страница 69: ...CHOWEL PATC 150A EU 60 5 Outside view of PATC 150A EU...
Страница 70: ...CHOWEL PATC 150A EU 61 6 Outside view of TB 30...
Страница 71: ...CHOWEL PATC 150A EU 62 7 Outside view of RB 10...
Страница 72: ...CHOWEL PATC 150A EU 63 8 Electrical connection for step down T R and SCR...
Страница 73: ...CHOWEL PATC 150A EU 64 9 Connection diagram for Timer Box connector 10 Connection diagram for SCR Box connector...