![CHOWEL PATC--150A-EU Скачать руководство пользователя страница 25](http://html1.mh-extra.com/html/chowel/patc-150a-eu/patc-150a-eu_instruction-manual_2603266025.webp)
CHOWEL / PATC-150A-EU
- 16 -
4-2 Setting the turns ratio
secondary current primary voltage
Turns ratio =
=
primary current secondary voltage
The value for the turns ratio may be entered in the each schedule Y20 by
TB-30.
See program sheet in Appendix.
If you want to control this welding controller by V.C mode, no need to set the
turns ratio.
4-3 Test welds in TEST mode
To select TEST mode is performed by mode select key of TB-30.
If you pressed [MODE] key, the mode will changed as "WELD" ,"TEST" and
"PRESS TEST". Instruction of each mode operation is as under mentioned.
- WELD
: Sequence is active and weld.
- TEST
: Sequence is active and not weld.
- PRESS TEST
: There is no sequence operation but there is only turning ON/OFF
of the VALVE OUTPUT in accordance with ON/OFF of the
PILOT INPUT.
If the mode set by the TB-30 is not the same as the mode of the weld
controller, the LED will flicker.
The test mode is solely for setting-up purposed.
Do not use it for production welds.
The another way to make TEST mode is performed WELD/NO WELD input signal.
The details are described in Chapter 6-4-1.
Содержание PATC--150A-EU
Страница 20: ...CHOWEL PATC 150A EU 11 Pulsation 1 9 times...
Страница 65: ...CHOWEL PATC 150A EU 56 1 Weld program sheet...
Страница 67: ...CHOWEL PATC 150A EU 58 3 I O connection diagram...
Страница 68: ...CHOWEL PATC 150A EU 59 4 RC 05 wiring diagram...
Страница 69: ...CHOWEL PATC 150A EU 60 5 Outside view of PATC 150A EU...
Страница 70: ...CHOWEL PATC 150A EU 61 6 Outside view of TB 30...
Страница 71: ...CHOWEL PATC 150A EU 62 7 Outside view of RB 10...
Страница 72: ...CHOWEL PATC 150A EU 63 8 Electrical connection for step down T R and SCR...
Страница 73: ...CHOWEL PATC 150A EU 64 9 Connection diagram for Timer Box connector 10 Connection diagram for SCR Box connector...