9
STEP 1
DETERMINE LOCATION FOR CONCRETE PAD AND OPERATOR
For compact installation refer to the Appendix for installation steps 1-4, pages 44-45.
DO NOT run the operator until instructed.
The illustration below shows the recommended dimensions for a standard installation. If these dimensions are not applicable for your installation refer
to the chart on the following page for alternate dimensions.
STANDARD INSTALLATION
Refer to the illustration to determine the measurements and location of the concrete pad.
28"
24"
Outside Property
Inside Property
29.5"
35.5"
11"
2"
46"
25"
10"
Short Arm
Long Arm
Hinge Center
Concrete Pad
INSTALLATION
• To AVOID damaging gas, power or other underground utility lines,
contact underground utility locating companies BEFORE digging
more than 18 inches (46 cm) deep.
• ALWAYS wear protective gloves and eye protection when changing
the battery or working around the battery compartment.
NOTE:
There should only
be a maximum of 4"
(10.2 cm) from the
center of the hinge to
the edge of the post or
column. If the distance is
greater than 4" (10.2 cm)
entrapment protection for
this area is required.
4" (10.2 cm) maximum