Page 20 | 1-800-343-9463
CCM9000
101017
INSULATION BLANKET INSTALLATION, CONTINUED
8 . Set piece (B) in place by pressing firmly on all surfaces of the insulation that come in contact with the top of each
evaporator unit (see illustration) .
9 . Using a utility knife, cut holes in the insulation for line set, wiring, and drain line if needed .
10 . Once insulation is installed, apply foil tape to all seams, covering them completely .
11 . Inspect insulation for damage/defects . If damaged, repair with foil tape .
12 . Apply cork tape or equivalent to areas where the line set, wiring, and drain line enter the unit .
If needed, trim excess insulation around all edges .
A
__ Min. Tack Time
Adhesive
__ Min. Cure Time
Directions
__ M
in. T
ack
Tim
e
Dire
ctio
ns
B
A
B
A
7 . Spray the top of each evaporator unit with spray adhesive . (See spray adhesive directions for proper tack time
before proceeding to step 8 .)