1.
Locate the desired installation location . Using a stud finder, locate the ceiling joists
on either side of the center point . Cut and frame 14 .5” x 36” openings in the ceiling
for each evaporator unit . Make sure the framing is sufficient to support the weight of
the cooling unit . Use only the mounting locations provided . These locations ensure
that the installer will not drill into any critical components within the system .
2.
Determine which orientation the evaporator units will be installed in (inside the
cellar or with attic access) . Mounting options are listed below:
Minimum Tools Needed:
Fully exposed mounting option
Flush mount option
Choose a mounting
option suitable
for the installation
location.
Partially recessed mounting option
Hammer
Saw
#2 Phillips-head screwdriver
SELECTING MOUNTING OPTIONS
T-square
1
2
3
4
12.65”
12.65”
5.75”
6.9”
6.9”
5.75”