![CE+T Power TSI Bravo Скачать руководство пользователя страница 16](http://html1.mh-extra.com/html/ce-t-power/tsi-bravo/tsi-bravo_user-manual_2577181016.webp)
8. Installation of Bravo pACk or Single shelf/shelves
■
Read safety instructions prior starting any work
■
Do noT attempt to use lifting eyes to erect the cabinet.
■
System is preferable handled without modules.
■
pay attention to the module position, make sure that modules are repositioned in the same slot.
■
T2S is always mounted in the first shelf, left hand position.
■
In pACk the 4th inverter position (1st sub-rack) comprise an output circuit breaker.
■
In three phase systems modules are configured per phase 1 (A, R), phase 2 (B, S) and phase 3 (C, T). These are not
interchangeable. make sure that modules from one phase are not mixed with modules from another phase.
8.1 mounting kit (Bravo pACk or Single shelf)
The mounting guide rail is adjustable to fit different kind of cabinet depths.
4x fixing brackets (ref 1)
2x Slider (ref 2)
2x mounting brackets (ref 3)
12x mounting screws (ref 4)
12x Cage nuts (ref 5)
Assemble the sliders and adjust the length to suit the
mounting depth
fix cage nuts (5) in the cabinet front and rear frame
of the left and the right side
fix the left and right slider of the cabinet with the
supplied screws (4)
2
2
2
3
4
4
5
5
16
– TSI Bravo – user manual – v7.0
Содержание TSI Bravo
Страница 46: ...20 Appendix 20 1 Cabinet foot print layout 46 TSI Bravo User manual v7 0...
Страница 51: ......