Installing the Chilled Water System Optimizer
Chilled Water System Optimizer v2
CARRIER CORPORATION ©2019
Installation and Start-up Guide
7
All rights reserved
Follow these steps:
1
Mount the controller.
(page 7)
2
Wire the controller for power.
(page 7)
3
Set the controller's address.
4
Communicate through the Local Access port.
(page 18)
5
Wire for communications.
(page 13)
6
Add the controller to the i-Vu® application.
(page 21)
7
Set up driver.
(page 23)
To mount the controller
WARNING
When you handle the Chilled Water System Optimizer:
• Do not contaminate the printed circuit board with fingerprints, moisture, or any foreign material.
• Do not touch components or leads.
• Handle the board by its edges.
• Isolate from high voltage or electrostatic discharge.
• Ensure that you are properly grounded.
Screw the controller into an enclosed panel using the mounting slots on the cover plate. Leave about 2 in. (5 cm) on each
side of the controller for wiring. See mounting dimensions in
Specifications
(page 2).
Wiring the controller for power
WARNING
Do not apply line voltage (mains voltage) to the controller's ports and terminals.
CAUTIONS
The controller is powered by a Class 2 power source. Take appropriate isolation measures when mounting it
in a control panel where non-Class 2 circuits are present.
Carrier controllers can share a power supply as long as you:
Maintain the same polarity.
Use the power supply only for Carrier controllers.
Installing the Chilled Water System Optimizer