44
DI
S
CHARGE END
S
UCTION END
FRAMES A AND B
NOZZLE ARRANGEMENT CODES FOR ALL 23XRV NOZZLE-IN-HEAD WATERBOXES
Fig. 51 — Piping Flow Data (NIH, Frames 3 Through 5 and A,B) (cont)
*Refer to certified drawings.
PASS
COOLER WATERBOXES
IN
OUT
ARRANGEMENT
CODE*
1
8
5
A
5
8
B
2
7
9
C
4
6
D
3
7
6
E
4
9
F
PASS
CONDENSER WATERBOXES
IN
OUT
ARRANGEMENT
CODE*
1
11
2
P
2
11
Q
2
10
12
R
1
3
S
3
10
3
T
1
12
U
Содержание EVERGREEN 23XRV
Страница 53: ...53 Fig 60 Typical Field Wiring Schematic LF 2 VFD Shown NOTE See Notes for Fig 60 on page 56 ...
Страница 54: ...54 Fig 60 Typical Field Wiring Schematic LF 2 VFD Shown cont a23 1585 ...
Страница 55: ...55 Fig 60 Typical Field Wiring Schematic LF 2 VFD Shown cont a23 1586 ...
Страница 60: ...60 Fig 63 23XRV Controls Schematic LF 2 ...
Страница 63: ...63 SEE NEXT PAGE SEE NEXT PAGE SEE NEXT PAGE Fig 67 23XRV Controls Schematic Rockwell Standard Tier VFD Shown ...
Страница 64: ...64 FROM PREVIOUS PAGE Fig 67 23XRV Controls Schematic Rockwell Standard Tier VFD Shown cont ...
Страница 73: ...73 Fig 78 Lead Lag Control Wiring Parallel Flow Application Unit with R Compressor Shown a23 1597 ...
Страница 74: ...74 Fig 79 Lead Lag Control Wiring Series Flow Application Unit with R Compressor Shown a23 1598 ...